The pads for the tanks were quickly prepared as soon as excavation was completed. The site had a lot of water so the contractor had to do a lot of extra work to install adequate drainage.
Posted by Picasa
Updates on the progress of the construction of the Audenreid AMD Treatment System in the Catawissa Creek Watershed.
The pads for the tanks were quickly prepared as soon as excavation was completed. The site had a lot of water so the contractor had to do a lot of extra work to install adequate drainage.